Aquatic Center

The Aquatic Center will be opening June 5, 2021 at noon! Watch our social media pages for updates and events!

August 2021 Hours

Monday-Thursday

Open Swim 12pm-5pm

Water Aerobics 5pm-6pm

Swim Lessons 6pm-7pm



Friday-Sunday Open Swim 12pm-8pm with a 30 min break at 4pm

Special Hours Saturday, August 7 and 14 Open Swim 12pm-5pm (Slides may not be open on these days)

REMINDER! Children 8 and under must be accompanied by someone who is 14 years of age and older. Those who are under the age of 8 and arrive at the pool alone will not be admitted to the Aquatic Center.

REMINDER! Diapers can not be changed in the pool area. All Patrons must shower before entering the pool deck area! 

Swimming lesson sign up will begin on Monday, March 15, 2021!

Aquatic Center
  • City Hall
  • Phone: 1-920-898-5766
  • Send Email
  • 2110 Washington Street
  • Seasonal Contact
  • Phone: 1-920-898-1373 IN SEASON PHONE
Aquatic Center will be open for the 2021 season on June 5th. Weekday Schedule June and July Open Swim Monday through Thursday 12 noon to 5Pm and 6PM to 8PM; August Open Swim Monday through Thursday 12 noon to 5PM; Water Aerobics/Lap Swim Monday through Thursday 5PM to 6PM; Swimming Lessons June and July 9AM to 12 noon and August at 6PM; Weekends June and July Friday through Sunday 12 noon to 8PM and August Friday through Sunday 12pm to 7PM. Friday-Sunday we take a 30 min. rest period from 4:00-4:30.

HOURS ARE SUBJECT TO THE WEATHER, POOL CONDITIONS,STAFFING AND POOL ATTENDANCE, THIS IS AN OUTDOOR FACILITY SO CALL AHEAD IF THE WEATHER IS QUESTIONABLE. 920-898-1373

  • Shower before entering the pool.

  • Shower after playing in the sand area.

  • Flotation devices must be approved by the aquatic center director.

  • Appropriate swimwear is required. No cut off jean shorts.

  • Swimmers under the age of 8 must be supervised by someone over the age of 14.

  • No alcohol or tobacco allowed inside the Aquatic Center fencing.

  • Swim diapers must be worn by all children who are not toilet trained. (Swim diapers are available at the front desk.)

  • All clothing and personal items must be placed in lockers or baskets. The New Holstein Aquatic Center is not responsible for lost or stolen items.

  • The New Holstein Aquatic Center staff has the authority to remove patrons who fail to adhere to rules and/or endanger the safety of other patrons or facility staff.

  • If you have been feeling ill with symptoms of diarrhea within the past two days, please do not enter the pool.

Background

In 2004, the New Holstein Park & Recreation Commission recognized that based on the age of the municipal pool, which opened in 1961, and from discussions with Kubiak Pools and Stubenrauch Architects on the condition of the swimming pool, it was time to evaluate the future of the city’s municipal pool. Mayor Ron Karrels and the Common Council created a Swimming Pool Committee and appointed 16 members from the community to serve on that committee. The committee received proposals from three pool consultants and eventually selected Aquatica Design, LLC, to evaluate the municipal pool to determine if renovating the pool was feasible. In December of 2005, Aquatica Design presented a study to the committee that included a demographic analysis, an evaluation of the pool and bathhouse, two renovation options and a new construction concept. After considering the study and the cost of renovating, the committee came to the conclusion that it was not financially feasible to renovate the existing pool, and recommended to the Common Council that the committee investigate the construction of a new aquatic center.

New Aquatic Center Study

In March of 2006, the committee began investigating the construction of a new aquatic facility. Data was gathered on existing indoor and outdoor aquatic centers that were recently constructed. Data included construction costs and annual operating revenues and expenses. In August of 2006, the committee completed its investigation, evaluated the financial data gathered on indoor and outdoor aquatic facilities, and recommended to the Council to have the committee pursue the construction of a new outdoor facility. The Common Council accepted the committee’s recommendation, and in November, the City contracted with Aquatica Design, LLC, to prepare a site analysis, facility needs analysis, and design a new aquatic facility. The site analysis was completed in March of 2007, and Mr. Bill Rollins with Aquatica Design, LLC, presented the findings to the committee. In April, the committee completed a facility needs analysis exercise, and in May, Aquatica Design presented a preliminary aquatic center design to the committee. The initial design was revised, based on input from the committee, and a revised design was presented and accepted by the committee.

New Aquatic Center

The new aquatic facility is a very important amenity that is needed in the community. The aquatic center provides swimming lessons for both children and adults living in the area, and offers an attractive outdoor recreation amenity to individuals considering making New Holstein their home. Neighboring communities have indoor facilities, thus an outdoor facility sets us apart from them, and continues to help make New Holstein a viable city for families looking for a community to live, work and play in.

The new aquatic center would be a zero-depth/beach-entry design. Features would include: runout slides, floor fountain jet play areas, interactive play features, a child’s slide, a diving board, a drop slide, a whirl cove, two lap lanes and a sand play area.

The bathhouse would include men’s and women’s restroom/changing areas, a handicap restroom/family changing room, a concession room, a rentable party/meeting room and storage areas.

Construction of the new facility would begin in August of 2008, with completion in June of 2009. The new aquatic center would be constructed at basically the same site as the existing pool, however, the facility would be pushed further to the southeast, and orientated to utilize the city’s existing parking lot. The estimated cost, projected for the 2008-2009 construction seasons, is 2.5 million.

Fundraising

The Swimming Pool Committee has decided to move forward and begin a capital campaign to help pay for the project. The committee has worked hard developing the new aquatic center plan and is excited and committed to building a new aquatic center. Please help support this important community project and make a generous donation. Naming rights for the Aquatic Center, bathhouse, slides, and many other aquatic center features are available to anyone interested in making a significant contribution. Every gift of $500 or larger will be permanently recognized on a plaque to be located at the Aquatic Center.